Lakewood, CA
Tile roof work in Lakewood, CA
The most common tile job is not a replacement at all. It is a lift-and-relay: the same tile comes off, new underlayment goes down, the tile goes back.
Describe the tile and slate job
Three questions, then the address. Up to three Lakewood contractors who do this work.
You are on the list.
No provider in Lakewood is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
Before you let anybody on the roof
The things worth pinning down on a tile and slate job. A contractor who has not raised them has not looked properly.
- The condition and age of the underlayment beneath
- Fastener specification, especially near salt air
- What percentage of tile breakage they expect and how it is priced
- Whether the tile can be salvaged and relaid
- Whether battens are being replaced at the same time
Matching discontinued tile is the real constraint. Salvaging what is there is usually cheaper and always closer.
Underlayment life under tile is typically twenty to thirty years. The tile above it is rated for fifty or more. Plan for one relay in the life of the roof.
Slate wants copper or stainless fasteners and a crew who has done it before. Steel nails on a slate roof is a hundred-year covering held down by a thirty-year fixing.
Locally
Close behind that: dry offshore wind that arrives all at once in autumn. They also drive ember risk, which is why vent screening and Class A assemblies matter more here than the colour of the covering.
About tile and slate here
Why does ventilation keep coming up?
Because a badly ventilated attic cooks the roof from underneath and takes years off it. Intake at the eaves and exhaust at the ridge, in balance. It is cheap during a re-roof and awkward afterwards.
I rent. Can I use this?
Only the owner can approve roofing work. If you are renting, the fastest route is to send this to your landlord or property manager rather than gathering quotes nobody can act on.
Are gutters included in a re-roof?
Usually not, unless the quote says so. If they are near the end of their life, replacing them during the re-roof is meaningfully cheaper than doing it later, because the crew and the staging are already there.
It is leaking right now. What do I do?
Move what you can out of the way, put a bucket under it, and if there is a bulge in the ceiling put a small hole at its lowest point to let the water out in one place rather than bringing the whole panel down. Then mark your request as an emergency — those go out first.
What is it going to cost?
Free, no obligation, and your details go to no company until you say yes.
